LDML Office Building

Posted by

Background

The LDML (Lac Des Mille Lacs First Nation)Office Building is located on the corner of Little Lake Road and Anemki Drive on the FWFN (Fort William Fist Nation) Reserve.  TBT Engineering has been retained by A49 Architects to help design this new building.

TBT Engineering’s Role

Tasks included a geotechnical investigation, laboratory materials testing, field services, mechanical, electrical and structural design.

Geotechnical Investigation

Tasks included geophysical investigations, geotechnical sampling. Geotechnical engineering recommendations were then developed and included topics such as ultimate bearing pressures, depth to founding strata, anticipated constructability issues, soil backfill requirements, potential for reuse of excavated soils, and preload design parameters.

Geotechnical Drilling

All necessary drilling was completed using our in-house drilling department.  Hollow stem augers facilitated soil sampling and down hole testing.  Diamond core drilling was used to sample bedrock.

Materials Testing – Laboratory

An extensive laboratory testing program was undertaken and included testing for moisture content, grain size analyses, and plasticity.  Other tests such as compression or point load testing where used.

Field Services

TBT Engineering performed hundreds of field compaction tests and also completed all concrete quality testing.  Subgrade inspections were completed to verify the suitability of materials for foundation bearing.


Fort Frances School

Posted by

Background

The Fort Frances School

TBT Engineering’s Role

Tasks included preliminary geotechnical investigations, pre load inspections, laboratory materials testing, field services, mechanical, electrical design and an extensive geotechnical drilling program.

Geotechnical Investigation

Tasks included geophysical investigations, geotechnical sampling. Geotechnical engineering recommendations were then developed and included topics such as ultimate bearing pressures, depth to founding strata, anticipated constructability issues, soil backfill requirements, potential for reuse of excavated soils, and preload design parameters.

Geotechnical Drilling

All necessary drilling was completed using our in-house drilling department.  Hollow stem augers facilitated soil sampling and down hole testing.  Diamond core drilling was used to sample bedrock.

Intervisable Control Establishment Surveys

Control Surveys were completed for proposed new school.  Trimble Series 3 R8 RTK Survey Grade GPS Systems were used, control points were established and related information, along with detailed site plans, were provided.

Materials Testing – Laboratory

An extensive laboratory testing program was undertaken and included testing for moisture content, grain size analyses, and plasticity.  Other tests such as compression or point load testing where used for concrete and bedrock.

Field Services

TBT Engineering performed hundreds of field compaction tests and also completed all concrete quality testing.  Subgrade inspections were completed to verify the suitability of materials for foundation bearing.