News Archive


Ecole Elsie MacGill Public School

Posted by

TBTE provided engineering services including mechanical, electrical, structural, civil, environmental, geotechnical, and legal survey services for the construction of a new elementary school building.

Ecole Elsie MacGill School

The school is 8,400 sq m and includes administration and staff areas, daycare, kindergarten, classrooms, servery, library, science classroom, gymnasium.


Matawa Education and Care Centre

Posted by

TBTE provided engineering services including mechanical, electrical, structural, civil, environmental, and geotechnical for the renovation of the Matawa Education and Care Centre building.

Areas of renovation to the 13,413 sq m building included basement, main floor and second floor.  The following areas were developed: public entrances, administration and student support, cafeteria and commercial kitchen, learning spaces, cultural, spiritual and recreational areas, exterior cultural spaces including sweat lodge and healing centre, physical and mental health spaces, student accommodations.


Salvation Army Journey To Life Building

Posted by

TBTE provided engineering services including mechanical, electrical, structural, civil, environmental, and geotechnical for the construction of the new Salvation Army Building.

The 1,318 sq m residential housing building included emergency shelter and transitional housing, administrative offices and related program spaces, two commercial kitchens, dining room, food bank, wellness centre, chapel, a commercial laundry, outdoor basketball court and extensive landscaping and stormwater management.


FedEx Terminal Design Build

Posted by

TBTE provided engineering services for a new pre-engineered FedEx Ground Terminal Building in Innova Park in Thunder Bay, ON.

TBTE provided structural, mechanical, electrical, civil, geotechnical, topographic survey and materials testing. In addition to the deliverables, TBTE provided contract administration services throughout construction.

The 1,127 sq m building includes a distribution area and administration office area.


MTO Contract Admin

Posted by

MTO Contract 2014-6026

Highway 11/17 Four Laning, 4.8km west of Highway 628 Easterly 11.8km (Red Rock to Nipigon).

This project consists of a divided four-lane facility from Red Rock Road No. 9 to east of Stillwater Creek as well as new structures at Itzcauldé Creek, South Trout Creek, North Trout Creek and Stillwater Creek

MTO Contract 2014-6018

Four-Laning Pass Lake, From 5.0 km west of Highway 587 easterly 6.6 km.

This project was a Design-Build Major contract for a 6.6 km section of Highway 11/17 constructed into a new four-lane divided highway with associated side road connections


Canada's Best Employers Career Directory

Check out current job opportunities at TBTEngineering.